Service Center | County Agencies | County Hall
 
space
Water & Sewer
Text Size:
  • Reset
  •   
  • Big
  •   
  • Bigger
  • Home | Water Service | Customer Service | Construction/Development | About Us | Contact Us | miamidade.gov
    space
    space
    Water Service space
  • Pay Your Water Bill
  • View Your Current Balance
  • View Your Latest Bill
  • View Your Billing History
  • View Your Payment History
  • Change Mailing Address
  • Change Phone Number
  • Start Service
  • Disconnect Service
  • Transfer Service
  • Billing Adjustments
  • space
    Customer Service space
  • How to Read Your Water Bill
  • Rate Comparison
  • Hurricane Preparedness: Water
  • Reclaimed Water
  • Publications
  • Get Your Free Showerhead!
  • Lower Your Water Bill with a Submeter
  • Cross-Connection Control
  • Pebble Award Nomination
  • space
    Construction/Development space
  • E-Plans Review
  • New First-Time Connections
  • Existing Water Service
  • Submitting Documentation
  • Pre-Construction/Development
  • Construction Contracts
  • Planned Capital Projects
  • Construction or Floating Meters
  • Design/Construction Standards
  • Plumbers and Contractors
  • space
    About Us space
  • Water Use Permit (WUP)
  • News Releases
  • Calendar
  • Our Director
  • space
    space space
    Print Print Email Email Helpful? Helpful?
    space
    space
    New First-Time Connections

    Please note: the following information is for making a new, first-time physical connection to the Miami-Dade Water and Sewer Department's (WASD) sewer system.  If the property you are responsible for has had sewer service in the past (in other words, it is already physically connected to the sanitary sewer system) and you simply need to open an account for sewer service under your name, please contact Customer Service at 305-665-7488. 

    If you are changing a property's previous type of use (example: building multiple residential units on land that was previously zoned for single family use), please note the following: in addition to any permits you would need for making the proposed change, as well as all of the items listed below, WASD would need the sewage flow allocation letter  from the Miami-Dade Department of Environmental Resources Management (DERM) to reflect any additional gallonage demand created by the change. WASD will determine if the sewer main fronting the property is of sufficient size for the additional gallonage demand and if it provides complete property frontage. 

    In order to connect your property to the WASD sewer system, please supply the following to the WASD New Business Office at either the LeJeune building, 3575 S. LeJeune Road (south of US-1) or the Miami-Dade Permitting and Inspection Center (MDPIC) at 11805 SW 26 Street in west Miami-Dade.

    Property Owner's information:

    • Property Owner's Name
    • Mailing address
    • Daytime Phone Number

    Property Information:

    • Project Address
    • An original property boundary survey, signed and sealed by either a Professional Land Surveyor (P.L.S.), or Professional Surveyor and Mapper (P.S.M.)
    • The folio number(s) of the property (this can be obtained by searching the County's property records at on the Property Appraiser's website  
    • The appropriate fee; fees are calculated at time of request, based on a property’s usage
    space
    space
    Tools for Building a Better Community
    Important Numbers

    Construction Complaint Unit
    (Non-billing)
    (786) 552-8970
     
    Cross-Connection Control Unit
    (305) 547-3046
     
    Call Before You Dig
    Sunshine State One Call of Florida
    1-800-432-4770

    space
    space
    space
    space
    Home  |  Privacy Statement  |  Disclaimer  |  Using Our Site  |  About Us  |  Phone Directory  |  Contact Us
    © 2008 Miami-Dade County. All rights reserved.
    Miami-Dade County Logo