Service Center | County Agencies | County Hall
 
space
Water & Sewer
Text Size:
  • Reset
  •   
  • Big
  •   
  • Bigger
  • Home | Water Service | Customer Service | Construction/Development | About Us | Contact Us | miamidade.gov
    space
    space
    Water Service space
  • Pay Your Water Bill
  • View Your Current Balance
  • View Your Latest Bill
  • View Your Billing History
  • View Your Payment History
  • Change Mailing Address
  • Change Phone Number
  • Start Service
  • Disconnect Service
  • Transfer Service
  • Billing Adjustments
  • space
    Customer Service space
  • How to Read Your Water Bill
  • Rates, Fees & Charges
  • Rate Comparison
  • Hurricane Preparedness: Water
  • Reclaimed Water
  • Publications
  • Get Your Free Showerhead!
  • Lower Your Water Bill with a Submeter
  • Cross-Connection Control
  • Pebble Award Nomination
  • space
    Construction/Development space
  • E-Plans Review
  • New First-Time Connections
  • Existing Water Service
  • Submitting Documentation
  • Pre-Construction/Development
  • Construction Contracts
  • Planned Capital Projects
  • Construction or Floating Meters
  • Design/Construction Standards
  • Plumbers and Contractors
  • space
    About Us space
  • Water Use Permit (WUP)
  • News Releases
  • Calendar
  • Our Director
  • space
    space space
    Print Print Email Email Helpful? Helpful?
    space
    space
    Construction & Development

    Pre-Construction Information (For Projects with Executed Service Agreements)

    Requesting a Pre-Construction Meeting with Miami-Dade Water and Sewer Department for a Project with an Executed Water and/or Sewer Service Agreement
    If you wish to request a pre-construction meeting with WASD on a project that includes an executed water and/or sewer service agreement, please note you must do so at least 48 hours (two business days) in advance of the time and date you desire.


    Procedure for Projects Within or Along State Roads (For Projects with Executed Service Agreements)
    Projects that will take place within or along any State road require a permit from the Florida Department of Transportation (FDOT) before any work is allowed.  This is in addition to any other permits required before work can be done.

    Requesting Re-Platting/Permanent Closure of Roads with Existing Water and Sewer Infrastructure
    If there is existing water and sewer infrastructure in an area you wish to re-plat-to include the permanent closure of roads wherein the water and sewer infrastructure is contained-you must submit the following documents and information to WASD.

    Construction or Floating Meters
    A construction, or floating meter, is similar to the standard water meter used at most residences and places of business to measure the water used.  However, unlike a standard meter, a floating meter is not attached or fixed to a specific site-it is portable (hence the term "floating").

    Construction Contracts
    To be eligible to bid on construction contracts with the Miami-Dade Water and Sewer Department, you must be licensed to perform the specified type of work in Miami-Dade County.

    Excavations
    A Miami-Dade County Ordinance passed in August 2000 includes a provision requiring that the boundaries of all proposed excavations of 1,000 feet or less--including do-it-yourself jobs-be marked with a white water-based paint. (see further explanation below) 


    space
    space
    Tools for Building a Better Community
    Important Numbers

    Construction Complaint Unit
    (Non-billing)
    (786) 552-8970
     
    Cross-Connection Control Unit
    (305) 547-3046
     
    Call Before You Dig
    Sunshine State One Call of Florida
    1-800-432-4770