(New, First-Time Physical Connection to the Miami-Dade Water and Sewer Department's Facilities)
Procedure to Obtain a New Water Service Installation from an Existing Water Main Please note: the following information is for making a New, First-Time physical connection to the Miami-Dade Water and Sewer Department's (WASD) water system. Procedure to Connect a Property to the Sanitary Sewer System for the First Time (New Connection) Please note: the following information is for making a New, First-Time physical connection to the Miami-Dade Water and Sewer Department's (WASD) sewer system.
Construction Complaint Unit (Non-billing) (786) 552-8970 Cross-Connection Control Unit (305) 547-3046 Call Before You Dig Sunshine State One Call of Florida 1-800-432-4770