Service Center | County Agencies | County Hall
 
space
Environmental Resources
Text Size:
  • Reset
  •   
  • Big
  •   
  • Bigger
  • Home | Information | Natural Resources | Environment | Building & Development | Contact Us | miamidade.gov
    space
    space
    Information space
  • Our Mission & Vision
  • News Releases
  • Brochures
  • Calendar
  • Adopt-a-Tree
  • Baynanza
  • Photo Gallery
  • Video Library
  • Volunteer & Careers at DERM
  • more >  
    space
    Natural Resources space
  • Air (Air Quality)
  • Land
  • Water
  • space
    Environment space
  • Climate Change
  • EEL Program
  • Ecosystems
  • Managing Pollution
  • Manatee Protection
  • Resource Conservation
  • Tree Resources
  • more >  
    space
    Building & Development space
  • Asbestos
  • DERM Reports, Plans & Maps
  • DERM Public Records Search
  • Flood Zones
  • Plan Review
  • Permits
  • Elevation Certificates
  • Environmental Regulations
  • Code Compliance
  • Pay Fees or Citations
  • EQCB
  • space
    space space
    Print Print Email Email Helpful? Helpful?
    space
    space
    Class V Permit

    What is the Class V Permit used for?

    The Class V permit is needed for temporary dewatering or whenever water is removed from an excavation, from the ground or existing structure to ensure that sediment, turbidity and contaminants are removed before it is later discharged.


    Why is the Class V Permit necessary?

    This permit is necessary to ensure that construction or maintenance activities do not cause adverse impacts to adjacent properties, do not impair existing waterways and surface waters, and do not cause contamination to the surrounding areas or water bodies.

    Discharge of turbid water (water full of sediment) into storm drains or bodies of water will cause clogging of existing drainage facilities, which causes flooding during storm events. When turbid water is discharged into water bodies, it can kill marine life and can pollute the water. This leads to the degradation of the water body, and increased flooding conditions.

    Some areas of Miami-Dade County also have contamination of the existing groundwater. Unregulated dewatering of contaminated groundwater will spread more contamination into adjacent properties.


    What other permits are needed for the Class V Permit before I can start work?

    Zoning approval from a local municipality or Miami-Dade County (if you are in unincorporated Miami-Dade) is required prior to construction activity.

    Depending on the features of each project, a Class I or IV permit may needed, as well as approval from the Public Works Department (if you are dewatering to a roadway with drainage), and municipalities (if dewatering to their streets).

    If the project dewaters a large volume of groundwater, or lasts longer than three months, a permit from the South Florida Water Management District may also be required.

    If dewatering is within areas of groundwater contamination, approval from the DERM Pollution Remediation Section is required.

    This question is intended to give you an idea of what other permits may be needed. Depending on your situation, you may need one or more of the above-mentioned permits. Additionally, there may be instances when a permit that is not listed here is required. We encourage you to call the contact number at the bottom of this page to discuss your particular case or to receive additional information.


    How long does it take to process the Class V Permit ?

    One (1) week.


    How much are the Class V Permit fees?

    Please see DERM Fee Schedule.


    How long is the Class V Permit valid?

    6 to 90 days

    For more information, please call 305-372-6681.